RONCO reads the drawings, writes the scope and prices it — including the interfaces nobody prices. The work on the floor is Ahavah Automation’s: their crews, their license, their site. RONCO is the sales and estimating side of that arrangement: the quote, the scope and the exclusions come from here.
RONCO does not install. RONCO’s side of this is commercial and on paper: the take-off, the scope, the exclusions, the number, the contract. Ahavah Automation performs the work — their crews, their license, their site, their name on the safety file.
Take the whole package or the single discipline holding your schedule up. Ahavah Automation performs all four; RONCO prices them and writes the interfaces into the scope before award.
Priced against Div. 26 Electrical · Div. 25 Integrated Automation · Div. 41 Material Processing & Handling · Div. 40 Process Interconnections
Conveyor runs, machine alignment and structural assembly set to tolerance by Ahavah’s crews, with as-built dimensions recorded on the way out.
Power distribution, panel build and field wiring designed for the load you actually run — drawn, labelled and traceable by Ahavah’s engineers.
Functional tests, calibration and staged start-up run by Ahavah’s technicians, so the line proves itself before it carries product.
Planning through final energization quoted as one package: one scope, one number, one commercial point of contact. Ahavah’s crews carry it out.
Every electrical package has the same arguments, and none of them are hard. They are only expensive when nobody priced them.
Who supplies the disconnect at the machine.
Who lands the leads on a vendor skid whose manual says only “field wiring by others.”
Who pulls through the sleeves the mechanical contractor cored.
Who buys the drive when the OEM quoted the drive and the panel both.
Who owns the network drop to the PLC.
Who fire-stops the penetration afterwards.
Ask every bidder to mark each one included or excluded, in writing, before you compare numbers. And name who holds the tag register at award. If nobody holds it, you hold it.
RONCO walks the floor before pricing, measures what is there and marks the constraints nobody drew.
Ahavah issues layouts, single lines and panel schedules for review before material is cut.
Ahavah’s mechanical and electrical crews sequenced around your production windows.
Ahavah works the system loop by loop, then function by function, with results recorded on the way.
As-builts, test records and an Ahavah walkthrough with the people who will run it.
Written so each stage closes before the next opens.
What leaves site with you. RONCO writes every line of it into the scope before award, and Ahavah produces it during the work rather than reconstructing it afterwards — which is the difference between a handover and a hand-wave.
Dimensions recorded on the way out, not measured back in once the crews have gone.
Issued for review before material is cut, and reissued to match what was actually installed.
Signed by the technician who ran them, loop by loop, so the record is written during commissioning.
Function by function through staged start-up, with the calibration figures attached.
Closed before demobilization. An open list at handover is an open list forever.
A walkthrough with the people who will run it, and the maintenance crew who will keep it running.
A continuity test proves copper. A loop check proves the tag.
A loop check injects at the field device and walks it: 4 mA, 12 mA, 20 mA. It confirms the engineering-unit value at the controller and again at the HMI, at 0, 50 and 100 percent of range. It confirms polarity, the rack, slot and channel, the scaling, the fail direction on signal loss, and that the alarm annunciates where the operator will actually be standing. Then the final element is stroked, and watched to confirm it moves the right way.
Three years from now, when a transmitter reads wrong and nobody who was on the job still works there, that sheet is the only thing that says what good looked like.
The same take-off answers both. The sentence they need first is different.
Priced against your drawings, installed by Ahavah Automation to your schedule, documented for your client's turnover pack.
Work planned around shift patterns and shutdown windows, with the outage sequence and the start-up plan written into the scope before you award it — and executed on site by Ahavah Automation.
Tell us which of the five you have and the number changes. Guess, and the estimate is fiction.
Four to six hours, nightly. Area struck and re-sanitized before first product, so everything has to come out and go back every shift.
Planned a year out. The constraint is congestion, not access.
Roughly October into January. The constraint is a calendar nobody on site controls.
Clean-side. Gated by cleaning and requalification on the way back in.
Minutes long, rehearsed dry beforehand, because there is no second attempt.
Column width is drawn to the length of the window.
The window is the outage, not the work. So the scope RONCO writes pushes everything that does not need the line down outside it — panels built and point-to-point tested on the bench, containment installed live, cable pulled, meggered and tagged, terminations dressed and waiting. What is left inside is only what cannot be done any other way, and Ahavah executes to that sequence.
A marked-up layout gets you a budget number. It comes back as four things, not a figure in an email.
In plain sentences, saying what we read the drawings to mean.
Line by line, covering the six interface items above.
Every place the drawing was silent and we picked a value, with the value shown.
Naming its own predecessor conditions: anchor bolts set and grouted, pad cured, penetrations cast, tray elevations reconciled against process and duct.
No discovery call required to get started — a marked-up layout is enough.